Basic construction 2
Rapper concrete placing is over. Begins construction of ground beams.
"Basepack" placed on top of the rapper. By connecting it to steel columns, and height as tall of the loan staff。
This is the "basepack".
Resulting also in scaffolding. It is like a maze.
"Basepack" placed on top of the rapper. By connecting it to steel columns, and height as tall of the loan staff。
This is the "basepack".
Resulting also in scaffolding. It is like a maze.
Tokimune sainenji Temple
〒403-0005
山梨県富士吉田市上吉田7-7-1
▼TEL
0555-22-0847
▼Fax
0555-22-1192
Mobile Site
Access from mobile phones and smartphones!